Computer Associates Project - Dallas, Texas
AIA: BOKA Powell
Engineer: James Johnson & Associates
Project Management: Hines Interest General: Centex Construction
Mechanical: MLN Company
(2) 98,500 CFM Custom Air Handling Units with 100% O. A. Economizers



FAA TECH Center & Trace Labs - Atlantic City, New Jersey
Mechanical Engineer: General Services Administration
Mechanical Contractor: Hutchinson Services
(1) 20,000 & (1) 14,000 CFM @ 8.5" TSP Custom Air Units with Gas Heat, Economizer & 3- Stage Absolute
Filtration

University of Pennsylvania - Philadelphia, Pennsylvania
Jones- Barrier Laboratory
Mechanical Engineer: William J. Trefz
(1) 12,500 Custom Air Unit with 100% O. A., 2- Stage 95% Filtration & Internal Piping Package


 

Piping package included both chill & hot water pumps, valves, gauges, thermometers and by- pass loop. All lines were factory insulated and turned downward thru floor grating. The yellow is a non- skid floor surface.
The University of Pennsylvania has (3) Air Zone Custom Air Units serving Labs with similar features.



Merck Laboratories Building 62 - Philadelphia, Pennsylvania
Mechanical Engineer: Integrated Project Services
(1) 31,500 @ 5.0" TSP Custom Air Unit with 100% O. A. Economizer & 2- Stage 95% Filtration

Merck Laboratories has (6) Air Zone Custom Air Units installed at their New Jersey facilities.

Each installation was to upgrade existing operations. All units requiredstarters, disconnect, lighting and modular construction.



Methodist Hospital Woodlands - Houston, Texas
Architect: HKS, Inc. Engineer: Smith Seckman Reid, Inc.
Project Management: Hines Interest
General Contractor: Turner Construction
Mechanical Contractor: TD Mechanical, Inc.

Project Requirements:
(21) Custom Air Handling Units up to 34,000 CFM at pressures up to
6.65".

The project required witness testing at Energistics Laboratory with a
mock-up equal to a typical project mechanical room. Air Zone was required to meet an NC 40 in the space adjacent to the mechanical
room.

There were more than 100 test runs conducted to establish that Air Zone met or exceeded the project requirements of NC 40.

Methodist Hospital & Smith Seckman Reid later specified Air Zone without substitution for the new Hospital in Sugarland, Texas.
Shown herein:  Jack Stegall, Mgr.
Energistics Lab.
Test in progress for 16,000 CFM unit



V. A. Hospital - Philadelphia, Pennsylvania
Engineer: General Services Administration
Mechanical Contractor: R. I. Williams, Inc.
(2) Custom Air Units 12,000 CFM at 8.0 “ TSP with 100% O. A. Economizer & 3- Stage Absolute Filter System
These units required witness testing for CFM, casing leakage and component static pressure loss.

Testing was performed by: Engineered Air Balance- Houston, TX

Air Zone Has been approved by the GSA for (2) V. A. Hospitals, for the GSA offices in Newark, NJ., the FAA TECH Center and Trace Lab in Atlantic City and many other military projects.



Project: ABN AMRO Plaza - Chicago, Illinois
Arichitect: De Stefano & Partners, Inc. Engineer: Environmental Systems Design, Inc.
Project Management: Hines Interest
General : Turner Construction
Mechanical : F. E. Moran, Inc.

(96) Column Air Units 10,000 CFM  (5) 5,000 CFM Column Air Units (7) Modular Air Units

Air Zone designed and developed the Column Air Unit to meet the needs of Hines Interest and the clients they represent that demand quiet dependable under floor air systems.

The maximum allowed space was a room 60" x 60", the maximum NC level was 40 with a CFM of 10,000.

Air Zone chose an Acme Star fan to foe the unique new design that was developed for this project.

Witness testing was conducted at Energistics Lab and Air Zone delivered the NC 40 required.