Main Place
960,000 SF
LEED Silver
Developer: Hines
Architect: Pickard Chilton
Consulting Eng: Wylie Associates
100 Vertical Upblast Air Columns
12,000 CFM each
41/42 NC Certified Sound Performance
CW Coils and UV Lights
Direct Drive Plenum Fan with Patented Easy Rollout
The Situation:
Hines Development is the preeminent
developer of green buildings in the
U.S., with over 30 million square feet
of green buildings built or currently
under construction - more than any
other developer in North America. Hines
wanted to create a 21st century icon for
downtown Houston. At 46 stories, this
building at Main Place will be Houston’s
next great downtown landmark.
Hines is no stranger to building worldclass
office buildings that attract the
best tenants. Wylie Associates, the MEP
consulting engineer on the project, was
tasked with designing a cost effective
mechanical system that consumed low
amounts of energy and reduced the per
floor mechanical room footprint. The
challenge: how could tenant space be
saved, the floor-by-floor AHus have quiet
performance, and energy consumption be
minimized?
Although it seemed like competing
objectives, Air Zone International was
ready to embrace the challenge.
Our Solution:
Designing a building to better
ASHRAE 90.1: 2004 Baseline Building
Performance is no easy task - especially
when that building is located in a hot,
humid climate. According to Wylie
Associates, the Air Zone Vertical
Upblast Air Towers contributed in a
significant way toward the building’s
overall operating cost savings. Why
are Air Zone’s air columns more energy
efficient that other solutions? Our Direct
Drive Plenum Fans with High Efficient
Motors use up to 6% less energy than
“standard” offerings, and our ultra low
leakage casing design ensures optimal
performance.
Of course, the real key to making this
design application work is to build units
that are quiet enough to be positioned
in the tenant space. Constructing a
column unit with MER V 13 Filters, CW
coils, UV Lights, and an open mechanical
room return plenum that can meet
rigorous NC 42 sound requirements in
an independent lab at the maximum CFM
was a challenge – but Air Zone met these
requirements.
The Results:
Exacting clients like Hines want air units
that will last a long time. Our relationship
with Hines is one that we value
greatly, and we take customer service
very seriously.
Our column units successfully passed NC
42 sound levels where other manufacturer’s
equipment has had challenges.
Our vertical column units are economical,
especially compared to the costs they
avoid. It has been estimated that every
square foot of tenant space saved is
worth $600 for the building’s valuation.
Our compact footprint was estimated
to have saved 50SF per floor when
compared to traditional core mechanical
rooms with horizontal units.
Air Zone’s column units are used in
hospitals, laboratories, offices and
factories. They are versatile, rugged
and quiet. The compact vertical column
unit footprint allowed the design team
to minimize the floor space required for
mechanical rooms significantly compared
to similar building types. Call today to
see what Air Zone can build for you.